• One of the industry’s most challenging projects
• Rigid insulated pipe-in-pipe production flowlines
• Main umbilical system connecting eight manifolds
• Installed in 1,500 meters of water
• Client achieved first oil in February 2014
;;;;;;;;;;;;;;;;;;;;;